KRI FKO – CRANKSHAFT REPLACEMENT AND ENGINE OVERHAUL

KRI – FKO Crankshaft replacement and engine overhaul was executed to prepare the ship for Multi Task Force mission in Lebanon on November 2022. This project start on 2020 with design and engineering planning, ordering spare parts and commissioned on April 2022.

TROUBLESHOOTING HGM 560 BIOGAS 2022 (ON SITE)

4000 Hours Maintenance PDE 1 dan 2 MAN 20V D28/33 On KRI GNR -332

KCR 40 & PC 40 ENGINE MAINTENANCE GENERAL OVERHAUL MAN D2862 LE433 – KRI Kujang

KCR 40 & PC 40 ENGINE MAINTENANCE GENERAL OVERHAUL MAN D2862 LE433 – KRI Terapang

10.000 HOURS MAINTENANCE S1 AND P2 10.000 HOURS MAINTENANCE S3 AND P4 RUSTON 20 RK 270 KRI USH- 359

KCR 40 & PC 40 ENGINE MAINTENANCE GENERAL OVERHAUL MAN D2862 LE433 – KRI Alamang

R2 SFGLD 360 BIOGAS – PT EVANS PALM OIL 2022 (ON SITE)